MT Pula in winter heavy weather Northwest Pacific Coast.

This 12 minute video is of the 600-foot product tanker Pula.  Built in 2006.  She is fully loaded on a winter voyage from the Cherry Point refinery in Washington State-bound for Guatemala. The storm lasted 4 days and resulted in a split in the bow. Fortunately, the next bulkhead held. Repairs were made in California before completing the voyage.

Leave a Reply